Please activate JavaScript!
Please install Adobe Flash Player, click here for download

GSR 2015

144 REFERENCE TABLES COUNTRY SECTOR / TECHNOLOGY TARGET China Bio-power 13 GW by 2015 Hydropower 330 GW by 2017 Solar PV 70 GW by 2017 (35 GW utility-scale and 35 GW distributed generation) CSP 1 GW by 2015; 3 GW by 2020 Wind power 150 GW by 2017 Colombia Electricity (grid-connected)1 3.5% of generation by 2015; 6.5% by 2020 Electricity (off-grid) 20% of generation by 2015; 30% by 2020 Croatia Transport 10% of transport final energy demand by 2020 Cyprus Transport 4.9% of transport final energy demand by 2020 Czech Republic Transport 10.8% of transport final energy demand by 2020 Denmark Wind power 50% share of generation by 2020 Transport 10% of transport final energy demand by 2020 Djibouti Solar PV (off-grid and rural) 30% by 2017 Dominican Republic Distributed power 20% by 2016 Egypt Hydropower 2.8 GW by 2020 Solar PV 220 MW by 2020; 700 MW by 2027 CSP 1.1 GW by 2020; 2.8 GW by 2017 Wind power 12% of generation and 7.2 GW by 2020 Eritrea Wind power 50% of generation (no date) Estonia Transport 2.7% of transport final energy demand by 2020 Ethiopia Bio-power from bagasse 103.5 MW (no date) Geothermal power 75 MW by 2015; 450 MW by 2018; 1 GW by 2030 Hydropower 10.6 GW (>90% large-scale) by 2015; 22 GW by 2030 Wind power 770 MW by 2014 Finland Bio-power 13.2 GW by 2020 Hydropower 14.6 GW by 2020 Wind power 884 MW by 2020 Transport 20% of transport final energy demand by 2020 France Ocean power and wind power (offshore) 6 GW by 2020 Wind power (onshore) 25 GW by 2020 Transport 10.5% of transport final energy demand by 2020 Germany Wind power 2.5 GW per year onshore through 2020; 6.5 GW offshore by 2020; 15 GW offshore by 2030 Transport 20% of transport final energy demand by 2020 Greece Solar PV 2.2 GW by 2030 Transport 10.1% of transport final energy demand by 2020 Guinea Solar power 6% of electricity by 2025 Wind power 2% of electricity by 2025 Guinea-Bissau Solar PV 2% of primary energy by 2015 Hungary Transport 10% of transport final energy demand by 2020 India Electricity 3.77 GW installed in 2014–2015; 30 GW added 2012–2017; 170 GW by 2022 Bio-power 400 MW installed in 2014–2015; 2.7 GW added 2012–2017 Hydropower (small-scale)2 250 MW installed in 2014–2015; 2.1 GW added 2012–2017 Solar PV 1.1 GW solar PV and 60 MW small-scale PV installed in 2014–2015; 20 million solar lighting systems added 2010–2022 Solar PV and CSP 100 GW by 2022 Wind power 2 GW installed in 2014-2015; 60 GW by 2022 TABLE R15. OTHER RENEWABLE ENERGY TARGETS (continued) BACK

Pages Overview